× Home About Services Our Projects Our Team Contact

Refurbishment Works (Replacement of Flooring and False Ceiling Replacement Works) & Refurbishment Works for Washrooms At T2 Terminal Infrastructure, Airside apron and Land side of IGI Airport.

Refurbishment Works (Replacement of Flooring and False Ceiling Replacement Works) & Refurbishment Works for Washrooms At T2 Terminal Infrastructure, Airside apron and Land side of IGI Airport.

  • Project - Refurbishment Works (Replacement of Flooring and False Ceiling Replacement Works) & Refurbishment Works for Washrooms At T2 Terminal Infrastructure, Airside apron and Land side of IGI Airport.
  • Client - DELHI INTERNATIONAL AIRPORT LIMITED
  • Consultant - GMR GROUP - DIAL
  • Architect - GMR GROUP
  • PMC - GMR GROUP
  • Nature of Work - Refurbishment Works (Replacement of Flooring and False Ceiling Replacement Works) & Refurbishment Works for Washrooms at T2 Terminal Infrastructure, Airside apron and Landside of IGI Airport. - The Scope of work includes basically the Replacement of Flooring and ceiling, Refurbishment works for the washroom, along with other allied works.
  • Project Cost - Rs. 17.68 Crores
  • Completion period - 06 months